Finance-Theory Β· Unit 6 Β· Video 2 Β· Interactive Practice

Two Prices Today, One Rate Next Year: Spot Rates and the Term Structure

IKey Formulas

FormulaNameWhat it says
P0=F(1+R1)(1+R2)β‹―(1+RT)P_0 = \dfrac{F}{(1+R_1)(1+R_2)\cdots(1+R_T)}Price from the chain of one-year ratesA theory of the price: the one-year rates RtR_t (date tβˆ’1t-1 to date tt) compound in sequence, and the face value FF is discounted by their product. The RtR_t are not observed today
r0,T=[(1+R1)(1+R2)β‹―(1+RT)]1/Tβˆ’1r_{0,T} = \left[(1+R_1)(1+R_2)\cdots(1+R_T)\right]^{1/T} - 1TT-year spot rateOne rate that, applied every year, gives the same growth factor as the chain: a geometric average of the one-year rates, not the rate for year TT alone
r0,T=(FP0,T)1/Tβˆ’1r_{0,T} = \left(\dfrac{F}{P_{0,T}}\right)^{1/T} - 1Spot rate from a pricePrice and face value are observed, so the spot rate follows: r0,5=(1/0.797)1/5βˆ’1β‰ˆ4.64%r_{0,5} = (1/0.797)^{1/5} - 1 \approx 4.64\%. Below a year the exponent 1/T1/T exceeds 1: r0,12=(1/0.983)2βˆ’1β‰ˆ3.49%r_{0,\frac12} = (1/0.983)^{2} - 1 \approx 3.49\%, an annual rate
P0,1P0,2=1+R2\dfrac{P_{0,1}}{P_{0,2}} = 1+R_2Forecast from two pricesWith the future one-year rates taken as known today, FF and (1+R1)(1+R_1) cancel. Both prices are observed today, so the ratio is their forecast of R2R_2: 0.967/0.927β‰ˆ1.04310.967/0.927 \approx 1.0431, R2β‰ˆ4.31%R_2 \approx 4.31\%

Key Insight: The spot rates are observable, and inside them sit the unobservable one-year rates, or at least today's expectations of them. For a one-year bond the chain holds one year, so r0,1=R1r_{0,1} = R_1; comparing the one-year and two-year prices then isolates the market's forecast of R2R_2.

IIOne Day's Term Structure, Written as Prices

Every STRIPS price converts to a spot rate by the same inversion, maturity by maturity.

IIITwo Prices, One Forecast

Dividing the one-year price by the two-year price leaves 1+R21+R_2: today's forecast of next year's one-year rate.

One-year price Pβ‚€,₁ 0.967

IVA Spot Rate Averages the Whole Chain

The five-year spot rate is a geometric average of five one-year rates, not the rate for year five.

πŸ’‘ Only P0P_0 and FF are observed; the one-year rates in the chain are not, so r0,5r_{0,5} is what the market's price reveals about them, as one average.

VQuiz Questions

Problem 1 Β· Read a Spot Rate off a Price

Given: on 1 August 2001 the ten-year STRIPS traded at 0.605 per $1 of face value. Find the ten-year spot rate r0,10r_{0,10}.

βœ… Correct! 0.605=1/(1+r0,10)100.605 = 1/(1+r_{0,10})^{10}, so r0,10=(1/0.605)1/10βˆ’1β‰ˆ5.15%r_{0,10} = (1/0.605)^{1/10} - 1 \approx 5.15\%: one of the rates in that day's term structure.
❌ That spreads the total return evenly. (1/0.605βˆ’1)/10β‰ˆ6.53%(1/0.605 - 1)/10 \approx 6.53\% ignores compounding. The rate compounds for ten years, so take the tenth root of 1/0.6051/0.605 instead of dividing by ten.
❌ That is the ten-year total return. 1/0.605βˆ’1β‰ˆ65.29%1/0.605 - 1 \approx 65.29\% is growth over the whole decade. The spot rate is annual: raise 1/0.6051/0.605 to the power 1/101/10 before subtracting 1.
❌ The price was not inverted. 1βˆ’0.6051/10β‰ˆ4.90%1 - 0.605^{1/10} \approx 4.90\% is a rate of discount on the price. The spot rate grows 0.605 into 1: (1/0.605)1/10βˆ’1(1/0.605)^{1/10} - 1.
Show solution

A STRIPS is a pure discount bond, so one dollar in ten years discounted back ten years gives the price:

0.605=1(1+r0,10)10⟹r0,10=(10.605)1/10βˆ’10.605 = \frac{1}{(1+r_{0,10})^{10}} \quad\Longrightarrow\quad r_{0,10} = \left(\frac{1}{0.605}\right)^{1/10} - 1

Since 1/0.605β‰ˆ1.6528931/0.605 \approx 1.652893 and 1.6528931/10β‰ˆ1.0515371.652893^{1/10} \approx 1.051537, the ten-year spot rate is about 5.15% a year.

Problem 2 Β· Below a Year, the Exponent Flips

Given: on the same day the three-month STRIPS traded at 0.991 per $1 of face value, so T=14T = \tfrac14. Find the annual spot rate r0,14r_{0,\frac14}.

βœ… Correct! The exponent is 1/T=1/(1/4)=41/T = 1/(1/4) = 4, so the ratio is raised to the fourth power: (1/0.991)4βˆ’1β‰ˆ3.68%(1/0.991)^4 - 1 \approx 3.68\% a year.
❌ The exponent went the wrong way. (1/0.991)1/4βˆ’1(1/0.991)^{1/4} - 1 takes a fourth root. The exponent is 1/T1/T, and with T=14T = \tfrac14 that is 44: below a year the ratio is raised to a power greater than 1.
❌ That is the three-month return. 1/0.991βˆ’1β‰ˆ0.91%1/0.991 - 1 \approx 0.91\% is earned over a quarter of a year. The spot rate is an annual rate, so compound it over four quarters.
❌ Multiplying by four skips compounding. 4Γ—0.908%β‰ˆ3.63%4 \times 0.908\% \approx 3.63\% adds four quarters of return without growth on growth. The spot rate compounds: (1/0.991)4βˆ’1(1/0.991)^4 - 1.
Show solution

The price of one dollar in a quarter of a year satisfies 0.991=1/(1+r0,14)1/40.991 = 1/(1+r_{0,\frac14})^{1/4}. Solving, the exponent becomes 1/T=41/T = 4:

r0,14=(10.991)4βˆ’1β‰ˆ1.036825βˆ’1r_{0,\frac14} = \left(\frac{1}{0.991}\right)^{4} - 1 \approx 1.036825 - 1

The three-month spot rate is about 3.68%, stated as an annual rate.

Problem 3 Β· Forecast, Then Average

Given: a one-year pure discount bond sells for P0,1=0.960P_{0,1} = 0.960 and a two-year one sells for P0,2=0.910P_{0,2} = 0.910, both per $1 of face value. Take the future one-year rates as known today.

What forecast of R2R_2 do the two prices give?

What is the two-year spot rate r0,2r_{0,2}?

βœ… Correct! The ratio gives 1+R2=0.960/0.910β‰ˆ1.05491 + R_2 = 0.960/0.910 \approx 1.0549, and the two-year spot rate 1/0.910βˆ’1β‰ˆ4.83%\sqrt{1/0.910} - 1 \approx 4.83\% sits between R1β‰ˆ4.17%R_1 \approx 4.17\% and R2β‰ˆ5.49%R_2 \approx 5.49\%.
❌ That subtracts the prices. 0.960βˆ’0.910=0.0500.960 - 0.910 = 0.050 is not a rate. The forecast comes from the ratio: P0,1/P0,2=1+R2P_{0,1}/P_{0,2} = 1 + R_2.
❌ That is the two-year spot rate. r0,2r_{0,2} averages both years. The forecast is for year 2 alone: 0.960/0.910βˆ’10.960/0.910 - 1.
❌ That is the two-year total return. 1/0.910βˆ’1β‰ˆ9.89%1/0.910 - 1 \approx 9.89\% uses only the two-year price. Dividing by the one-year price removes the first year's factor.
❌ Halving the total return skips compounding. (1/0.910βˆ’1)/2β‰ˆ4.95%(1/0.910 - 1)/2 \approx 4.95\%. The spot rate is the square root: 1/0.910βˆ’1\sqrt{1/0.910} - 1.
❌ That is the rate for year 2 alone. r0,2r_{0,2} is not the rate for year TT; it is the geometric average of R1R_1 and R2R_2.
❌ That is the rate for year 1 alone. R1=1/0.960βˆ’1β‰ˆ4.17%R_1 = 1/0.960 - 1 \approx 4.17\% equals r0,1r_{0,1}. The two-year spot rate averages it with R2R_2.
❌ Not quite. Divide the one-year price by the two-year price and subtract 1.
❌ Not quite. Solve 0.910=1/(1+r0,2)20.910 = 1/(1+r_{0,2})^2 for r0,2r_{0,2}.
Show solution

Forecast. With the same face value, FF and (1+R1)(1+R_1) cancel in the ratio of the prices:

P0,1P0,2=1+R2=0.9600.910β‰ˆ1.0549⟹R2β‰ˆ5.49%\frac{P_{0,1}}{P_{0,2}} = 1 + R_2 = \frac{0.960}{0.910} \approx 1.0549 \quad\Longrightarrow\quad R_2 \approx 5.49\%

Spot rate. The two-year price alone gives it:

r0,2=10.910βˆ’1β‰ˆ1.048285βˆ’1β‰ˆ4.83%r_{0,2} = \sqrt{\frac{1}{0.910}} - 1 \approx 1.048285 - 1 \approx 4.83\%

Check through the chain. 1+R1=1/0.9601 + R_1 = 1/0.960, and (1/0.960)(0.960/0.910)=1/0.910\sqrt{(1/0.960)(0.960/0.910)} = \sqrt{1/0.910}, so both routes give the same r0,2r_{0,2}: the geometric average of R1β‰ˆ4.17%R_1 \approx 4.17\% and R2β‰ˆ5.49%R_2 \approx 5.49\%.

Problem 4 Β· From Two Spot Rates to a Forecast

Given: the one-year spot rate is r0,1=3%r_{0,1} = 3\% and the two-year spot rate is r0,2=4%r_{0,2} = 4\%. Find the forecast of R2R_2, the one-year rate from year 1 to year 2, that these rates imply.

βœ… Correct! (1.04)2=(1.03)(1+R2)(1.04)^2 = (1.03)(1+R_2), so 1+R2=1.0816/1.03β‰ˆ1.05011 + R_2 = 1.0816/1.03 \approx 1.0501 and R2β‰ˆ5.01%R_2 \approx 5.01\%.
❌ That treats r0,2r_{0,2} as an arithmetic average. 2Γ—4%βˆ’3%=5%2 \times 4\% - 3\% = 5\% would make 4% the simple mean of 3% and 5%, but (1.03)(1.05)βˆ’1β‰ˆ3.9952%\sqrt{(1.03)(1.05)} - 1 \approx 3.9952\%, short of 4%. Compound: 1.042/1.031.04^2 / 1.03.
❌ The two-year spot rate is not the rate for year 2. r0,2r_{0,2} averages R1R_1 and R2R_2. With R1=3%R_1 = 3\% below the average, R2R_2 must sit above 4%.
❌ That is the gap between the spot rates. 4%βˆ’3%4\% - 3\% is not a one-year rate. Solve (1.04)2=(1.03)(1+R2)(1.04)^2 = (1.03)(1 + R_2).
Show solution

For one year the chain holds one factor, so R1=r0,1=3%R_1 = r_{0,1} = 3\%. The two-year spot rate compounds to the same growth as the chain of two one-year rates:

(1+r0,2)2=(1+R1)(1+R2)⟹1+R2=1.0421.03=1.08161.03β‰ˆ1.050097(1 + r_{0,2})^2 = (1+R_1)(1+R_2) \quad\Longrightarrow\quad 1 + R_2 = \frac{1.04^2}{1.03} = \frac{1.0816}{1.03} \approx 1.050097

The forecast is R2β‰ˆ5.01%R_2 \approx 5.01\%. The same number comes from prices per $1 of face value: P0,1=1/1.03β‰ˆ0.970874P_{0,1} = 1/1.03 \approx 0.970874, P0,2=1/1.0816β‰ˆ0.924556P_{0,2} = 1/1.0816 \approx 0.924556, and their ratio is 1.0816/1.031.0816/1.03 again.

Solved: 0 / 4